Re-piling is the renovation that changes what the house stands on. In an older New Zealand house it often comes bundled with other work, because once the subfloor is accessible everything else under the floor becomes easy to reach. That is an opportunity, and also the reason it deserves a plan: structure, consent, services, insulation and heritage rules all meet beneath the floorboards.
Schedule 1 of the Building Act 2004 exempts general repair, maintenance and replacement from consent where a comparable product or assembly is used and, for replacement, it is in the same position. The exemption does not cover complete or substantial replacement of a building product or assembly that contributes to the building's structural behaviour. That wording is the pivot. Swapping a single rotted pile for a comparable one in the same place can sit in the exempt category. Re-piling a significant part of the house, changing pile positions or type, or altering how the floor is supported moves into building work that the council will expect to be consented.
Where the line falls in a given house is the council's call, and the safest course is to describe the work to it in writing before you start. The Act sets the stakes: section 40 provides a fine of up to $200,000 for carrying out building work without a required consent, and a further fine of up to $10,000 a day while the offence continues. Read the exemption wording yourself in the Building Act 2004.
If a consent is needed, section 112 applies to alterations of existing buildings. After the work, the building must continue to comply with the Building Code at least to the extent it did before, and as nearly as reasonably practicable with provisions on means of escape from fire and access for people with disabilities where those apply.
BRANZ's Level guide has a warning that surprises people. If you plan to fully demolish a building built before 1900, or do work where any surface excavation could disturb material from before 1900, you must first get authority from Heritage New Zealand Pouhere Taonga. The example it gives is re-piling an 1895 villa. That does not mean the work will not go ahead; it means authority is needed first, and sometimes an archaeologist is involved. Details are on the Level culture and heritage page.
Local rules can add to this. In character and heritage areas, check district plan overlays before you plan the work.
While the floor is open, assess:
A re-piled house is the best moment to deal with the things that are awkward later.
Ground moisture barrier. Installing a ground moisture barrier in an existing building's subfloor space is exempt from consent under Schedule 1. For rentals with enclosed subfloors, Tenancy Services says one must be installed where possible, to NZS 4246:2016 or with a vapour flow resistance of at least 50 MNs/g.
Insulation. Thermal insulation in an existing building is also exempt, apart from external walls and fire separation walls. BRANZ says to use a product designed for under floors, press it firmly against the floor, and take care with cables. It advises that foil should be removed before new insulation is added and that retrofitting foil has been banned since 1 July 2016. See the Level guide to insulation for existing homes.
Wiring. Level warns that installers have been electrocuted by stapling through a live cable under floors, and that polystyrene should be kept separate from PVC-sheathed cable.
Level floors, sticking doors and cracked linings are likely to improve when the house is properly supported, but expect finishing work: gaps, cracks and stretched linings often need repair afterward, so budget for it. Because re-levelling can disturb old paint and linings, check Health NZ's advice that buildings from the 1980s or earlier should be presumed to have lead-based paint, and see its lead guidance before sanding or stripping.
Keep consent documents, inspection records, certificates and photos of piles and the barrier before they are covered. They matter at sale, and for any later council query.
Rules change, so confirm current requirements with your council before work begins.