Ask anyone who has repainted a villa or a 1960s brick-and-tile and they will tell you the paint itself is the quick part. The days go on what comes before it: finding out what the old surfaces are made of, deciding what can be disturbed, and getting the substrate sound and clean. In a house built before the late 1980s, that first question is also a safety question, because old paint and old linings can carry lead and asbestos.
Health NZ's guidance on lead-based paint is blunt about age. Until 1965 many paints sold in New Zealand had high lead levels, and pre-1945 paints were particularly bad. Its advice is that a building from the 1980s or earlier should be presumed to have been painted with lead-based paint, even if the top coat is recent, because old layers sit underneath. You cannot pick lead paint by eye, but a simple test can show whether a surface is a hazard, and the local public health service can advise if you are unsure. The detail is on the Health NZ lead-based paint page.
Asbestos belongs in the same early check. BRANZ's Level guide notes that asbestos-based products were widely used in construction from the 1920s to the mid-1980s, including wall claddings, vinyl floor coverings, decorative ceilings, adhesives and paints. Textured ceilings and old sheet linings are the usual suspects inside a house; if a surface is in question, a sample goes to a laboratory before anyone sands it. The Level asbestos page lists the sample sizes laboratories need: roughly two $2 coins' worth for cladding or flooring, and a tablespoon for a decorative ceiling finish, including any sparkly or stipple material.
Sound material that is left alone is not the main danger. The risk comes from cutting, sanding, scraping and breaking, because that puts fine particles into the air and onto every surface. Thorough preparation is exactly the kind of work that does this. A professional approach to paint preparation therefore treats testing, containment and clean-up as part of the job rather than an extra.
Health NZ's safety points for old paint are practical:
Heat is a particular trap. A blow torch will produce lead fumes, and a hot air blower or electric stripper still calls for a toxic-dust respirator and a fire extinguisher or water close by. Abrasive blasting is not suitable for buildings built or painted before 1970. Dry sanding with machines needs a vacuum attached and a respirator, and Health NZ notes that even a belt sander with an extraction bag is only partly effective.
For a house that has tested clear of hazards, or where the hazard is managed, preparation tends to follow a sequence that avoids doing work twice:
The order matters most between steps one and three. Sanding creates the dust, so it is best done before furniture returns, before floors are finished, and before the new coating is anywhere near the surface.
Kitchens and bathrooms are the places where older paint fails first. BRANZ's guidance for wet areas says paints and clear finishes should not be used on surfaces that are continually wet. Where wetting is occasional and ventilation is good, a water-based acrylic enamel applied over a solvent-based sealer is generally satisfactory, and the ability to withstand moisture is better on water-resistant plasterboard. High-gloss coatings wear best and clean most easily, but they show substrate flaws and add glare; matt finishes belong only in dry rooms. The full table of options is in the Level wet area linings guide.
This is also why a cheap repaint over a damp wall tends to peel. The coating is not the failure; the moisture is.
Generally not. The Building Act 2004 lists internal linings and finishes of walls, ceilings and floors of an existing dwelling among the work that does not need a building consent. That exemption still comes with conditions: the work must comply with the Building Code to the extent the Act requires, must not make the building less compliant than it was, and must not breach any other law. Health and safety duties and waste rules still apply, which is where asbestos and lead come back in. The exemption is in Schedule 1 of the Building Act.
Take advice first if tests show lead or asbestos, if the surface is a textured ceiling, or if the room has been damp. A painting contractor such as Eggshell & Co can look at what is on your walls and tell you what the preparation will involve before you commit to a colour. A short list of questions to put to anyone quoting: