Removing a wall: load-bearing or not

Opening up two rooms into one is a classic renovation, and the wall in the way is rarely labelled. Some internal walls are nothing more than partitions. Others carry the roof, hold the house square in an earthquake, or separate fire compartments. The rules treat them very differently, so the question to answer first is what the wall actually does.

What the Building Act says

Schedule 1 of the Building Act 2004 lists building work in connection with an internal wall, including an internal doorway, in an existing building as exempt from building consent. The exemption has five exclusions. It does not apply if the wall is:

All five are in clause 11 of the Schedule, in the Building Act 2004. If your wall fits any of them, you are in consent territory. Section 40 says building work must not be carried out without a required consent, and the fine for doing so can reach $200,000.

Even an exempt wall removal is conditional. Under section 42A, the work must comply with the Building Code to the extent the Act requires, must not leave the building less compliant than before, and must not breach any other enactment.

Reading the five exclusions

Load-bearing. The wall supports something above it: a roof, a ceiling structure or a floor. Walls in older houses may carry loads in ways that are not obvious.

Bracing element. Houses resist wind and earthquake loads through bracing, often in the walls. Remove a braced wall and the house can lose resistance without any visible sign.

Fire separation. Firewalls divide spaces for fire safety; the Act simply lists them as an exclusion, so a wall that separates one fire compartment from another needs checking with the council.

Specified system. Wall cavities can contain systems that the Act treats specially, such as fire alarms or means of escape provisions, and removing the wall can affect them.

Masonry. Brick and similar walls are excluded altogether.

How to find out what the wall does

None of these checks replaces professional advice, but they help you ask better questions.

  1. Look above. What sits on the wall: ceiling joists, roof trusses, a floor above, a beam? A wall with the roof structure bearing on it, or a floor above, is a candidate for being load-bearing.
  2. Check the roof space and subfloor. Joists that lap or end over the wall, or piles and a bearer aligned beneath it, suggest it is carrying load.
  3. Check the plans. Council property files may hold the original drawings and any earlier alterations. Plans showing a wall as bracing, or masonry, rule out the exemption.
  4. Look at the material. Masonry or concrete walls are excluded.
  5. Ask. If you are unsure, ask a licensed building practitioner, a structural engineer or the council. They can confirm what the wall does and what a design needs to show.

When in doubt, treat the wall as structural until someone qualified says otherwise.

If consent is needed

Expect to provide a design for the alteration, usually a beam to take the load the wall carried, with supports and foundations capable of carrying it down to the ground. Section 112 applies to alterations to existing buildings. After the work, the building must comply as nearly as reasonably practicable with the Code on means of escape from fire and on access for disabled people where relevant, and continue to comply with other provisions at least to the extent it did before.

The consent process gives you inspections at points where things will later be hidden, which is useful on a structural alteration.

What is inside the wall

Even a non-structural partition is not empty. It may contain:

See the Level asbestos page and the Health NZ lead page.

Level also notes that when running wiring or pipes through framing, drilling and notching must stay within the limits in NZS 3604, so you cannot simply cut away studs to make room for services.

Order of works for removing a wall

  1. Confirm what the wall does, and the consent position.
  2. Test for asbestos and lead in the linings and paint.
  3. Isolate and make safe services in the wall.
  4. Prop the structure as the design requires, install the beam or alternative, and have it inspected.
  5. Remove the wall and make good the floor, ceiling and framing.
  6. Re-run services and have them certified.
  7. Re-line, stop, paint and finish.

Doing the finishing before the structural work is signed off is a common waste of money.

Making good

Removing a wall leaves a scar across floor, ceiling and the adjoining walls. Allow for matching flooring, ceiling lining repairs and painting a full wall rather than only the patch. Schedule 1 exempts work on internal linings and finishes of an existing dwelling, subject to the same conditions as above.

Rules and exemptions are amended over time, so check the current wording before you begin.