Renovating an older house tends to start with a handshake and a quote. Past a certain price the law steps in. For residential building work of $30,000 or more, including GST, a written contract is mandatory, and the contractor owes you specific documents before you sign. These rules are consumer protections, so they are worth knowing before you are standing in a half-demolished kitchen.
MBIE's guide for homeowners sets it out. You must have a written contract for residential building work costing $30,000 or more including GST. It recommends a contract even for smaller jobs so everyone understands obligations and expectations. Building work here is broad: any work in relation to construction or alteration of a building, including a garage, retaining wall or fence, and painting or decorating that forms part of an alteration. Redecorating on its own, with no construction or alteration involved, is not building work.
The contractor is whoever you contract with directly. They need not be a builder; a plumber or electrician dealing directly with you counts.
Before you sign, if the work will cost $30,000 or more or if you ask for it, the contractor must give you two things. One is a disclosure statement covering the legal identity of the business, the key contact person and their qualifications, insurance (including the amount and any exclusions), and guarantees or warranties offered. The other is the prescribed consumer protection checklist, which walks through seven steps: becoming informed, agreeing project structure, hiring competent contractors, agreeing price and payments, having a written contract, taking control, and resolving disputes.
Contractors can be fined for not supplying these documents when required. The guide gives the figure for failing to provide a written contract, checklist or disclosure information as up to $2,000.
MBIE lists the minimum content:
If a contract is missing minimum content, default clauses apply, though they do not override an existing clause on the same topic. The guide points out that this minimum covers only the basics and recommends legal advice before signing. It also mentions NZS 3902:2004, a plain-English housing, alterations and small buildings contract sponsored by MBIE, available from Standards New Zealand.
The variations clause matters more in an old house than a new one. Any change to the work listed in the contract is a variation and needs to be put in writing, with the price and timeline effect checked. When rot or an old repair appears behind a lining, the variation process is what keeps the extra cost visible. Consumer NZ's renovation guide advises instructing the builder in writing about every change to the specified work and getting a written costing.
Payments are another place the checklist is specific: think carefully before agreeing to pay more than the value of work completed plus materials supplied at the time of payment. It also says a fixed price is preferable where possible, and that the lowest price is not always the best.
Once the work is finished, two protections apply regardless of price. First, a 12-month defect repair period: if you tell the contractor in writing about defective work before the 12 months are up, they must fix it within a reasonable time. In a dispute during that period, the contractor must prove the defects are not their fault or their product's.
Second, implied warranties under the Building Act apply for up to 10 years, whether or not they are in your contract. They cover most aspects of the work, from compliance with the Building Code to workmanship and timely completion. After the first 12 months, the burden of proving a defect shifts to you.
The warranties do not apply if the defect was caused by events beyond human control, accidental damage by others, your failure to do normal maintenance, your failure to arrange repairs promptly, or your not following the contractor's advice. If the contractor goes out of business you lose that protection, though you may still have rights against subcontractors. Design work is outside these provisions, although other laws may protect it.
Start with the contract and talk to the contractor. Many disputes come from misunderstandings about terms, unrealistic expectations of quality for the price, not understanding the effect of changes, or unclear instructions. Withholding payment during a dispute may make things worse, because the contractor can start dispute processes if a payment falls due. The next steps in the guide include mediation, the Disputes Tribunal and the District Court.