A bathroom is the room in a house most likely to fail slowly and invisibly. A tiled shower can look perfect for years while water finds its way through a failed membrane into the framing behind it. Almost everything that matters in a bathroom renovation happens in layers that are covered up, so the checking has to happen before they are.
Older bathrooms were built to different expectations. Expect timber boards or old sheet linings, tiles laid straight onto board, particleboard floors, and sometimes materials that need testing before demolition. BRANZ's Level guide lists vinyl floor coverings, wall claddings and adhesives among the products that contained asbestos up to the mid-1980s, and Health NZ advises presuming that paint on buildings from the 1980s or earlier is lead-based. Test before demolition or sanding; see the Level asbestos page.
Level also lists how water damage shows up: rot to wall and floor framing, rust in fixings, softened linings, flooring and cabinetry (especially particleboard and MDF), peeling paint, and water pooling in the subfloor. Strip back far enough to see the extent of any of those before you decide what to rebuild.
Wet areas must comply with Building Code clause E3 Internal Moisture, which aims to protect users from illness and injury and the rest of the building from water damage. Acceptable Solution E3/AS1 and E3/AS2 set out routes to compliance, and E3/AS2 references the membrane manufacturers' Code of Practice for Internal Wet-area Membrane Systems. The principles are in BRANZ's wet area design guide.
Points that matter in practice:
For a timber-framed floor, BRANZ recommends H1.2 treated framing as a minimum, and H3.1 where water damage near a shower could threaten the framing if waterproofing is compromised. Under a membrane and tiles, the substrate should be compressed fibre-cement sheet, tile underlay or H3.2 plywood treated with CCA, not LOSP. Flooring-grade particleboard is not permitted as a new substrate under the membrane in a wet area according to the membrane manufacturers' Code of Practice, though use is at the building consent authority's discretion; if it is used it should be H3.1 and the whole floor waterproofed, including under baths and vanities.
Plasterboard behind tiles needs protection. Level says water-resistant plasterboard must have a waterproofing system when used as a tiling substrate in a shower or around a bath or basin, and BRANZ recommends a membrane behind tiles in all splash areas. Details are in the Level wall linings guide.
Electrical work is covered by its own rules. Prescribed electrical work must be done by authorised people, and connected work needs to be tested and certified before it is connected to the supply.
Plumbing and drainlaying are for authorised tradespeople. Schedule 1 of the Building Act treats sanitary plumbing and drainlaying as outside the general repair and replacement exemption. It does exempt alterations to existing sanitary plumbing as long as the number of fixtures is not increased and no specified system is affected (water heaters excepted), and minor alterations to drains, such as shifting a gully trap, but adding a fixture or moving a bathroom is a different matter. Whether a consent is needed depends on the work, so check the exemption wording in the Building Act 2004 or ask the council. Replacing internal linings and finishes in an existing dwelling is exempt, but waterproofing that fails is a durability problem under the Code.
Step seven is what separates a bathroom you can sell from one you cannot document. Insist on records.
Rules and guidance are updated, so check current versions of the sources below.